Organization Structure – 2021 (Samanala Complex Office)
Samanala complex belongs to the generation division of Ceylon Electricity Board. It is located in Ratnapura New Town, Ratnapura District, Sabaragamuwa Province. This office, which was located in a rented building in Divurumpitiya Gatahatta office, was permanently built on a land owned by CEB in Ratnapura New Town and was opened on 17th September 2017.
At that time the Deputy General Manager was Engineer HS Somathilaka and the Chief Engineer was Engineer Sepala Karunasena.
From 2017 to 2021, Engineer HS Somathilaka, from 2021 to 2023 Engineer Sepala Karunasena, from 2023 to 2024 Engineer Udaya Ambepitiya held the position of Deputy General Manager, and currently Engineer JR. Mr. Sellahannadi works as Deputy General Manager.



Power Stations
- Samanalawewa Power Station
- Kukule Ganga Power Station
- Inginiyagala Power Station
- Udawalawa Power Station
- Uma Oya Power Station
- Total Installed Capacity – 815.2MW 100%
- Expected Gigawatt Per Year – 2862.7GWh 100%
- Availability Factor 100%